Strategic Location of Semi-Finished Prod

From SimOpt

Jump to: navigation, search
About the Problem


Reported Results
  • None.


Related Problems
  • None.
Comments
  • Added deterministic constraint sum(x)==exp(demand) which is manifested in two different constraints, because constraints need to be of the form constr >= 0.
  • Recommended budget: 1000, 10000


References



Back to Simulation Optimization Library!
Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox