Optimization of a Production Line

From SimOpt

Jump to: navigation, search
About the Problem


Reported Results
  • None.


Related Problems
  • None.
Comments
  • Assume that queue for the first server has infinite capacity.
  • If more than one starting solution is required, generate the mean service times uniformly between 0 and 2.
  • Note: Smaller value of c1 is recommended to keep a non-negative return value.
  • Suggest [200; 1000; 5000; 20000] as budget.


References



Back to Simulation Optimization Library!
Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox